Home Photo Galleries Progress On Saloon F.31, November 2011
31-i

The bulkhead has been removed from the Port Erin end of the coach in readiness for the fitting of a corridor connection; note the brake ducket on the floor,


31-ii

The interior has now been completely stripped out and will be re-fitted with new seating and tables suitable for use in conjunction with the proposed Rolling Lunch services.

31-iiiThe stripped interior of the coach; the brown leatherette seating fitted in 1981 when it became part of the Bar Set has been lost and will be replaced with new fixed seating suitable for dining.